HVACMatch
Permits and code

Do you need a permit to replace a furnace in Michigan?

What LARA's exemption list means for a furnace, AC or heat pump swap, who pulls the permit, what an inspection checks and what the fees look like.

By the HVACMatch editorial teamPublished Oct 19, 2026Last reviewed Oct 19, 20267 min read
Short answer

Almost certainly yes. Michigan's mechanical permit rule exempts only replacement of minor parts and a short list of small portable equipment, and a furnace is on neither. Your city or township building department usually issues the permit, so the fee and the paperwork depend on where the house sits.

What the state permit rule says

LARA’s Bureau of Construction Codes states the rule in one line: except for replacement of minor parts, mechanical work shall not be started until a permit has been issued by the appropriate enforcing agency. Homeowners must secure a permit for their own work, and mechanical contractors are responsible for the permits on work they do for an owner.

Then comes the exemption list, which LARA words exactly like this: “portable equipment (heating, ventilation, cooling units, evaporative cooler, gas burners with less than 30,000 Btu/hr.), self-contained refrigeration equipment and window-type air conditioners of not more than 1.5 hp, and oil burners not requiring connection to a flue (oil stoves, heaters equipped with wick).”

Hold a furnace up against that sentence. A furnace is not portable, it connects to a flue and a gas line, and it is not a window unit. A split air conditioner and a heat pump are not on the list either. The conclusion that a replacement needs a permit is our inference from the list, because LARA’s page never says the word furnace. It is a short list, and the inference is not a stretch.

Which code the inspector holds you to

The Michigan Mechanical Code is Part 9a of the state construction code, and rule R 408.30901a adopts the 2021 International Mechanical Code with listed exceptions, effective March 12, 2024. LARA has proposed moving to the 2024 edition, which we describe as a proposal only.

For houses, LARA says one- and two-family provisions sit in the Michigan Residential Code. A Court of Claims order from July 7, 2025 temporarily blocks the 2021 version of that code, so the 2015-based residential code stays in force while the order stands. ICC’s Michigan page has not caught up, so do not rely on it for a house.

Who can pull the permit

Two people can. The first is a licensed mechanical contractor, since Michigan’s statute requires the holder of the license to secure the permit. The second is an owner who occupies a single-family dwelling, installs the system personally and signs the owner affirmation on the application.

If you hire out the work, ask the company for its license number and the permit number once the permit exists. The steps for checking a license are in how to find a licensed HVAC contractor in Michigan. A quote that never mentions a permit is worth a question.

Inspection and concealed work

After a homeowner’s own installation, the applicant must obtain the required inspection once the work is complete and the equipment is running. LARA’s FAQ adds a rule about timing: concealed work may not be covered until it has been inspected, even if the inspector has not shown up within 72 hours. Permits have to be secured before the work starts, and most expired permits cannot be reopened.

Plans are required for a residential home when total heating input exceeds 375,000 BTU/H. A single furnace swap sits well below that, and the figure matters mainly for large or multi-unit systems.

What the permit costs

There is no single Michigan fee, because who issues the permit decides what it costs. Where LARA itself enforces the code, its BCC-9 form lists a $75 non-refundable application fee, $50 for a residential heating system, and $30 each for gas or oil burning equipment, a split air conditioner, a split heat pump and a residential boiler.

Everywhere else the city sets the schedule. These are the ones we read:

  • Grand Rapids, effective July 1, 2026: $52 application, which includes one inspection, plus $21 for a furnace or for an air conditioner or heat pump replacement. By our arithmetic a like-for-like furnace swap comes to $73.
  • Sterling Heights, 2026 to 2027: a $55 non-refundable application fee, plus $57 for gas or oil equipment up to 75,000 BTU or $64 from 75,001 to 500,000 BTU.
  • Dearborn, form dated October 2025: a $100 administrative fee and an $80 minimum permit fee, with $50 for a heating system up to 75,000 BTU and $30 for an air conditioner under 5 tons.
  • Westland, form revised July 1, 2026: $100 administrative fee and a $100 minimum permit fee, with $83 for a furnace up to 75,000 BTU. Ask the city whether the minimum raises a single $83 item.
  • Warren: an $80 minimum on a form revised in April 2023, so it may be out of date. Troy’s 2026 to 2027 schedule lists a $75 minimum and $98 for a gas burner up to 75,000 BTU, though matching your equipment to its rows is our reading.

We could not read current schedules for Detroit, Livonia, Ann Arbor or Lansing, so call those building departments.

Where the permit comes from

Every one of the 30 cities we researched enforces the mechanical code itself, according to LARA’s Statewide Jurisdiction List (revision of October 6, 2026), so the state fees above rarely apply to a house in a large city. For other places, check the list before you call, because a county or the state may be the enforcing agency. Permits can also be obtained online through LARA’s Accela portal, and the Building Trades Section answers questions at 517-241-9313.

Each city guide names its permit office, for example Grand Rapids and Sterling Heights. A licensed contractor must also register the license with the local enforcing agency, and that registration fee may not exceed $15.

If you disagree with a local inspector, appeal to the local construction board of appeals. Where the state has jurisdiction, the appeal goes to the State Construction Code Commission.

If the permit is skipped

The nearest consequence is a stop order. When work runs contrary to a permit or the act, the enforcing agency gives written notice to show cause within one working day and may then post a stop-construction order.

For whoever did the work, unlicensed practice under MCL 339.5601 is a misdemeanor on a first violation, with a fine of up to $500 or up to 90 days in jail, or both. A second violation raises the limit to $1,000 or one year, and a third or later one is a felony with up to $25,000 or five years. A lapsed or suspended license counts as unlicensed. Those penalties attach to unlicensed work, which tends to travel with a skipped permit.

The furnace replacement page covers what the job involves, and the furnace replacement cost guide explains what we can and cannot say about price. A new furnace also changes your carbon monoxide picture, which is why we wrote about alarms and furnaces.

Questions people ask

Can I replace my own furnace in Michigan?

Only in a single-family home you own and live in. The permit application carries an owner affirmation, you pull the permit yourself, and you must get the inspection once the equipment is running. Rentals and investor-owned houses are not covered.

Who pulls the permit, the HVAC company or me?

For hired work, the licensed mechanical contractor does. The licensing statute ties the permit to the license holder, so the company builds the fee into its quote and you can ask to see the permit number.

How much is a furnace permit in Michigan?

It depends on the city. Grand Rapids lists a $52 application plus $21 for a furnace, and Sterling Heights lists a $55 application fee plus $57 or $64 depending on input. Where the state enforces the code, LARA's form lists $75 plus $50 for a residential heating system.

What happens if the work is done without a permit?

The enforcing agency can issue a show-cause notice within one working day and then post a stop-construction order. The person who did the work may also face a misdemeanor if they were not licensed.

Do I need a permit to replace an air conditioner or heat pump?

By the same reading of LARA's exemption list, yes. Only window units of not more than 1.5 hp and similar small equipment are exempt, and a split AC or a heat pump is not among them.

Cost figures are estimates, not quotes. Rules and prices change: confirm with your local building department and ask any HVAC contractor for the license number. We are a referral service, not an HVAC contractor. How we check.

Need an HVAC contractor? Get matched

Free to use. Three short steps: the job, the place, then how to reach you.

What do you need help with?
Something else · all 11 services

We check whether a company serves your ZIP before we ask for your phone number.

Free to use. The heating and cooling company that receives your request pays us; you never do. How it works

Get matched